Comprehensive Medical Wastewater Disinfection Treatment Equipment for Environmental Safety

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Information

Model NO.
HRXS-LA
Type
Sewage Water Treatment Equipment
Method
Physical Treatment
Usage
Industrial, Home, Agriculture, Hospital
Capacity
0.1-2000L/D
Dimensions
1300*750*1850 mm
Power
≤2.2kw / AC220V
Weight
300 Kg
Max Flow
1.5m³/H
Material
Carbon Steel Surface Electrophoresis Spray
✔

Design Thought

Wastewater Treatment Design
●Special measures to ensure removal of harmful components and anti-corrosion for pipelines.
●Stable performance instruments with high processing efficiency and reasonable pricing.
●Compact and aesthetic structure layout to minimize land space usage.
●High impact load capacity for varying water quality and quantity.
●Full consideration of noise and odor control to prevent secondary pollution.
●Automated control system for improved stability and effluent quality.
★

Applications

➤Education Institutions: Laboratories of Life Sciences, Chemical Engineering, Materials Science, and Medicine.
➤Research Institutes: Testing centers and inspection centers during research processes.
➤Disease Control Centers: Physical and chemical testing, microbiology PCR, P2, P3, and P4 laboratories.
Application Scenarios
⚙

Process Characteristics

Process Characteristics
1.Outdoor all-in-one unit with high-grade weather-resistant paint spraying.
2.Automatic protection for leakage, electric shock, and high/low pressure.
3.Digital LCD display for real-time monitoring of water quality indicators.
4.Acid and alkali corrosion-resistant accessories with multiple safety layers.
5.Precise liquid level control with automatic standby and timed operation.
📋

Product Parameters

Parameter KHSYS-001 RHSYS-A1T KHSYS-003 KHSYS-03T
Size (L*W*H) mm 650*500*1420 1500*750*1500 1300*750*1850 1500*800*1850+...
Power Input AC220V AC220V AC220V AC220V
Operating Power (kw) 0.37 2.2 2.2 4
Capacity (L/D) 500 1000 2000 3000
Technology Acid-base neutralization + high-voltage ozone electrolysis + multi-media filtration + UV disinfection
✚

Other Related Products

🏢

About Our Expertise

Company Facility

Occupying 3300 square meters, our facility hosts a team of over 30 seasoned engineers and environmental specialists, bringing a wealth of expertise and management acumen to the industry.

Our team has pioneered a unique advanced oxidizing technology (LTOP), delivering a highly efficient and cost-effective suite of solutions for challenging wastewater and waste gas treatment.

?

Frequently Asked Questions

Q: What are the accepted payment methods? A: TT and L/C are acceptable. We typically require a 30% deposit before production and the 70% balance before loading by TT.
Q: What is the standard delivery time for orders? A: Delivery time depends on order quantities, but generally, it is within 3-4 weeks.
Q: How is the equipment protected against corrosion? A: We use world-famous protective coatings, such as epoxy-coal tar pitch, applied strictly according to standard industrial processes.
Q: How is the installation handled at the destination? A: We provide detailed illustrations and can send technicians to guide installation, debugging, and staff training.
Q: What kind of warranty do you provide? A: We propose solutions within 24 hours for any malfunction. Non-human caused issues are repaired free of charge during the warranty period.
Q: What certifications does the equipment hold? A: Our equipment is certified with CE, ISO9001, and ISO14001 standards.
Welcome to visit and conduct business cooperation!

Related Products